Highlights
COREP

Design, preparation, teaching, tutoring and management for the "Master of Advanced Studies in: Industrial Engineering and Operation", in cooperation with SUPSI and COREP.
.

ENGIE Servizi S.p.A. |
Repowering Of The Trigeneration Power-Plant For The Alcantara Plant, Narni (Terni) Environmental Impact Assessment Screening at the Ministry of the Environment and IPPC Authorization. Thermal Backup Power Plant In The Municipality Of Leinì Environmental Impact Assessment Screening at the Ministry of the Environment. |
EATALY Real Estate S.r.l. |
Building For Commercial Activities And Services – Green Retail Park - Green Pea Noise impact assessment – Passive acoustic requirements of the building – Environmental Impact Assessment Screening. |
TELENERGIA – EGEA S.p.A. |
District Heating Plant Authorization procedure pursuant to Legislative Decree 115/2008 of the new district heating plant in the city of Alessandria. |
TANARO Power S.p.A. |
Water Fluent Hydroelectric Plant On The Tanaro River – S.Vittoria Environmental monitoring. |
.

ARPA INDUSTRIALE S.p.A. |
HAZOP and SIL study for the new production line (Fenix Factory Project) - Bra (CN) plant. |
IREN ENERGIA S.p.A. |
Identification and assessment of safety and business continuity risks applied to IREN Group hydroelectric power stations. In detail to hydroelectric plants in Torino – Valle Orco and Torino – Fiume Po areas, to Pont Ventoux – Susa plant, to Nucleo idroelettrico di Tusciano" plants. |
VENATOR PIGMENTS S.p.A. |
HAZOP analysis (PHA) for modification of process plant for red iron oxide - Venator Pigments Plant in Turin. |
OLT OFFSHORE LNG TOSCANA S.p.A. |
Floating and storage regassification terminal “FSRU Toscana” – SSLNG Service: Risk assessment – Seveso Directive (D.Lgs. 105/2015) fulfilment and HAZOP for "Small Scale LNG Service" modification to the Floating Storage and Regasification Unit "FSRU Toscana". |
.

SAIPEM S.p.A. |
SPRINGS Project Subsea sea water treatment and injection system (Total – Veolia) – Support to the Qualification process and RAMS analyses. RAM Analysis NLNG Complex Expansion RAM Analysis - NLNG Train 7 Project - FEED phase – Nigeria. |
ALSTOM FERROVIARIA S.p.A. |
RCM Study of the electrical powered train Trenitalia Media Capacità (TMC) – Coradia stream - Alstom Ferroviaria. |
SENTINEL CH. S.p.A. |
Sentinel Diagnostic, Milan production site - Maintenance Plan assessment and definition of possible improvements - Pilot study for cold store and related systems. |
BASELL POLIOLEFINE ITALIA S.R.L. |
R&D SF2 Plant (Catalyst Development) Ferrara. PHA (Process Hazard Analysis) and Risk Assessment according to Corporate standard. Preparation of SCE/CAC/IPL List, ALARP Assessment, Auto Refrigeration and Brittle Fracture Prevention Analysis, SIL Allocation according to Functional Safety standard IEC/EN 61511- IEC/EN 61508 (where applicable); Engineering Scope Study – Reliability analysis and Functional Safety assessments related to Safety Instrumented Systems and support to the management of design and procedural recommendation. |
PROJECT AUTOMATION S.p.A. |
RAMS Analysis for Single Point Controller System – Midland Metro Alliance – WCCE & CSQ Extension Phase 1 Project – Birmingham (UK). |
ENIPROGETTI S.p.A. |
Maintenance Engineering services, RAM Analyses and Maintenance Workload Estimate for Zohr Field, Execution Phase and additional activities (project updates and sensitivity analyses) - EniProgetti SpA project – Egypt. |

